Routine Ultrasonic Plastic Welder Maintenance
The routine maintenance items for an ultrasonic welder are simple unless there is a machine failure. The following are recommended maintenance procedures.
1. Make sure that you have a Mylar washer between the converter and booster and between the booster and horn. We recommend replacing these washers every 6 months. A bag of (10) Mylar washers can be purchased for $12.00 from Plastic Assembly Technologies, Inc. at www.patsonics.com.
The Plastic Assembly Technologies part numbers are as follows:
· MW-12 for a bag of (10) Mylar washers for use on ultrasonic horns and boosters with ½-20 studs
· MW-38 for a bag of (10) washers for use on ultrasonic horns and boosters with 3/8-24 studs.
2. When disassembling the stack (ultrasonic converter, booster & horn) for replacing the Mylar washers, check the studs to make sure they are properly torqued. The stud torque is 290 inch/lb for 3/8-24 studs and 450 inch/lb for ½-20 studs. When reassembling the stack, the torque specification of the converter to the booster and the horn to the booster is 220 inch/lb.
3. Drain the air filter as required if it has collected moisture. Dry air is recommended as air with moisture will eventually impact the functionality of the pneumatic system.
4. Once a year or more in dirty environments, use light air pressure or vacuum to clean the inside of the power supply. Make sure the power is disconnected before following this procedure.
Ultrasonic Weld Joint & Part Design
Energy Director Design
While it is possible to ultrasonically weld plastic materials without specific joint design details, the weld process is greatly enhanced by adding proven features that aid in the process. For example, without a means of alignment built into the joint it is impossible to predict where the parts will be positioned after welding. This is due to the nature of the vibratory process created by ultrasonic welding. This means of alignment is accomplished through the use of step joints, tongue and groove joints, pins and sockets, raised walls, ribs or other features that are used to keep the vibratory process under control to maintain the desired alignment of the parts after welding.
A feature that is shown in these joint alignment pictures is the molded-in triangular shape of material called an energy director. This molded-in triangular ridge of plastic is very effective at reducing the cycle time to achieve a weld and in compensating for non-uniform wall surfaces. The energy director design has been used for years as a means of focusing the energy to improve weld strength and reduce cycle time. The energy director is typically placed only on one half of the part and runs along the surface to be welded. Without this energy director the weld quality would be suspect for many applications. The peak of the energy director should be sharp with a triangular shape formed from a 60º or 90º included angle. A 60º angle is generally used with crystalline materials and a 90º is used with amorphous materials. Material types by polymer structure are illustrated below:
Amorphous Resins 90º Angle |
|
Semi-Crystalline Resins 60º Angle |
ABS-Acrylonitrile Butadiene Styrene |
|
PA- Polyamide (Nylon) |
ABS/PC-ABS/Polycarbonate |
|
PBT-Polybutylene terephthalate (Polyester) |
ASA-Acrylonitrile Styrene |
|
PE-Polyethylene |
Acetate |
PEEK-polyetheretherketone |
|
PC-Polycarbonate |
PET-Polyethylene terephthalate (Polyester) |
|
PEI-Polyetherimide |
PMP-Polymethylpentene |
|
PES-Polyethersulfone |
POM- Polyacetal |
|
PMMA-Acrylic |
PP-Polypropylene |
|
PPO-Polyphenylene Oxide |
PPS-Polyphenylene sulfide |
|
PS-Polystyrene |
|
|
PSU-Polysulfone |
|
|
PVC-Polyvinyl Chloride (Rigid) |
|
|
SAN-Styrene Acrylonitrile |
|
|
SBC-Styrene Block Polymers |
|
|
Depending upon the wall thickness and the application, the energy director typically varies in height in a range from .010 to .035 of an inch. The minimum height recommended is .010 for most amorphous materials, .020 for semi-crystalline materials and the amorphous polycarbonate material. While we’ve seen energy director heights of .060 of an inch tall, most energy directors don’t exceed .035. Using a 90º energy director design, the height of the energy director is often determined by the width of the wall where the width of the wall is divided by eight, so that we have an energy director height equal to W/8.
Without some designed in approach to controlling flash, an energy director by itself has the potential for molten material to flow beyond the wall creating flash outside the weld joint. If flash is a problem the use of step joints, tongue and groove joints, flash traps, raised walls and energy director placement have all been employed as a means of controlling the material flow.
Two types of joints commonly used to control flash and provide alignment are the step joint and the tongue and groove.
Both of these joints provide excellent flash control and the alignment necessary for a good ultrasonic weld joint design. The tongue and groove design provides the added benefit of being as an excellent reservoir for the melted material. This pooling of plastic material helps contain the material and increases the likelihood of a hermetic seal. The additional height of .010 to .025” added as a gap around the periphery of the part provides a shadow line that helps to hide variation with part tolerances and melt flow during the ultrasonic welding process. This is a feature that we highly recommend because it helps to eliminate potential flash caused by the mating perimeter surfaces touching and it becomes imperceptible to the eye when the weld melt down is not perfect.
Recent advancements with the energy director design have resulted in the use of the criss-cross energy director design. Essentially, the criss-cross energy director design utilizes the standard energy director shape where a triangular shaped bead of material is molded into the plastic wall. The energy director has typically been placed only on one half of the part and runs along the surface to be welded. Although it usually doesn’t matter which of the parts to be welded incorporate the energy director, it is probably more common to find the energy director on the half that the horn contacts. With the use of the criss-cross design, additional energy directors are added to the mating part, which increases the amount of material interaction. On the mating surface opposite the perimeter energy director, a series of perpendicular energy directors are molded-in to mate with the perimeter energy director. See the illustration above.
When a hermetic seal is desired these additional energy directors should take on a saw tooth pattern with each energy director repeating from the base of the proceeding energy director. Because there are energy directors on both mating surfaces, the energy director height on each half should be reduced to prevent excessive material flash during welding. Typically, it is recommended that the criss-cross energy director height be approximately 60% of the standard design.
The criss-cross energy director joint design is particularly effective when used in combination with a tongue and groove. Because of the increased material flow with the criss-cross energy director design, it is recommended that a tongue and groove joint be used to capture the additional plastic and contain the flash.
This criss-cross design certainly increases the mold cost, but we’ve seen applications where the weld strength has far exceeded expectations and hermetic bonds have been achieved that might not have been achieved using the standard energy director on one mating surface.
Shear Joint Design
Although the energy director design can work satisfactory for welding semi-crystalline plastic materials, there are circumstances that warrant the use of another type of joint design. When welding materials like nylon, polyacetal, polyester, polyphenylene sulfide, polypropylene or polyethylene and a hermetic seal is required, the shear joint has proven beneficial for many applications. Therefore, the shear joint is frequently used when a hermetic seal is required on semi-crystalline plastic materials.
The reason for using a shear joint relates to the way the semi-crystalline material flows when introduced to heat. These types of plastics have a very sharp melting point and once the heat is reached to create a melt flow, the material immediately becomes liquid and flows rapidly. Semi-crystalline plastics also re-solidify within a small temperature variation. When an energy director is used with semi-crystalline plastics, the molten material gets exposed to a lower temperature when outside of the melt zone and can re-solidify before the desired bond is achieved. Because the melt zone of a shear joint is held along a vertical wall, the temperature variation is reduced within this melt zone since the material is not easily exposed to the surrounding air.
The shear joint is not the answer for all applications. We recommend caution when applying the shear joint to polypropylene or polyethylene due to the lack of rigidity in these materials. The lack of stiffness with these materials often results in pushing past the shear joint instead of melting and welding the material at the joint interface. The shear joint requires high tolerance, so we also recommend caution incorporating a shear joint design on larger parts. The shear joint should not be used when a part is larger than 3 ½” in diameter or has sharp corners or unusual shapes. When you are welding semi-crystalline parts under one or more of these caution conditions, the 60º energy director should be considered. If a hermetic seal is required on a product made from semi-crystalline resins and an energy director should be used because of the material, size, shape or tolerance requirements, the use of the criss-cross energy director design has proven successful for specific applications. Reference the information above for welding semi-crystalline material with an energy director.
What Plastic Welding Process Should You Use?
It’s impossible to say that one method or the other is absolutely the correct process due to the feasibility of welding your part with multiple processes. Each process does have its advantanges and disadvantages and when considered in combination with material selection, part size, part geometry, part requirements and a host of other considerations, you will likely be on the path to selecting a process more suitable for your application. We hope the chart below will be useful in your selection process.
ULTRASONIC WELDING | VIBRATION WELDING | SPIN WELDING | HOT PLATE WELDING | LASER WELDING | |||||
Amorphous Plastics | √ | √ | √ | √ | ? | ||||
Semi-Crystalline Plastics | ? | √ | √ | ? | ? | ||||
Parts with Complex Geometry | ? | √ | ? | √ | ? | ||||
Parts Requiring Welds on Internal Features | √ | ? | ? | √ | √ | ||||
Small Parts | √ | ? | √ | √ | √ | ||||
Large Parts | ? | √ | ? | √ | ? | ||||
Round Parts | √ | √ | √ | √ | √ | ||||
Non-Round Parts | √ | √ | X | √ | √ | ||||
Long Unsupported Walls | √ | X | X | √ | √ | ||||
Viable Process | √ | ||||||||
Maybe | ? | ||||||||
Don’t | X |
Machine Troubleshooting
MACHINE OVERLOADS – POWER SUPPLY, CONVERTER, BOOSTER, HORN OR OTHER FAILURE?
1. Begin by pushing the test button to see if the power supply overloads when running the converter, booster and horn in air. If the power supply overloads in air, remove the converter, booster and horn from the welder and inspect the assembly carefully. Look to see if there are visible cracks, check to see if the horn is properly torqued to the booster and if the booster is properly torqued to the converter and then check to see the interconnecting studs are properly torqued. Loose horns, boosters and studs will cause overload conditions. If the stud is loose, torque the stud to 290 in-lb for 3/8-24, 450 in-lb for 1/2-20 and 70 in-lb for 8mm stud. If the horn or the booster appears loose, tighten to these torque specifications: 220 in-lb for 20 KHz and 95 in-lb for 40 KHz. If either of these components appears cracked, contact us at 317-841-1202 or www.patsonics.com. A word of caution is in order. It is possible that you cannot visibly see a crack, but a crack does exist.
2. If everything appears to be okay in step 1, disassemble the converter, booster and horn. Make sure the mating surfaces of the converter, booster, and horn are clean. Check to see if there is a .003 thick Mylar washer between the interfaces. If so, remove the washers. (Note: if the washers were in place it is likely that the interfaces will be clean.) If the surfaces are not clean, wipe the interfaces with a soft cloth or paper towel. If the interfaces show pitting or residue buildup, they will need to be resurfaced. To resurface, remove the studs that connect the booster to the converter and the horn to the booster. Place a sheet of 400 grit emery cloth to a flat surface and pull the component with the worn surface against the emery cloth. The component should be pulled in a straight line, not in a figure 8 or other pattern, and held perpendicular to the emery cloth. You should recondition the components by pulling in one direction only and then rotating the component 120 degrees and re-stroking. It is not necessary to apply pressure as the weight of the converter, booster or horn should be sufficient to provide the needed force. This process should be repeated until most of the pitting or residue is removed and this is usually accomplished within a few rotations. Note: It may not be possible to remove all of the pitting. You don’t want to remove all of the craters if the pitting is deep because these are tuned components and too much removal of material will alter the frequency. Once you have the interfaces clean, the converter, booster and horn should be reassembled.
3. Before reassembling the converter, booster and horn, inspect the interface studs that were removed in step two above. It is possible that these studs have failed and will need to be replaced. If the studs are in good condition they can often be reused, but this is a great opportunity to replace the studs if they are available. Reinstall the studs using the specifications provided in step 1. The interfaces between the converter and the booster and the booster and the horn should be treated before reassembling. If you have Mylar washers available, this would be the preferred way of protecting the interfaces. Place one Mylar washer over the stud of the booster and one Mylar washer over the stud of the ultrasonic horn. A bag of Mylar washers can be purchased from Plastic Assembly Technologies, Inc. for $10.00. If Mylar washers are not available, you should use a small amount of silicone grease between the interfaces. Be careful not to apply the silicone grease to the mating studs. Reassemble the converter, booster and horn assembly and retest the stack for the overload condition.
This post will be updated frequently in an effort to provide you with additional information on machine troubleshooting. Please check back for more updates. Thanks for visiting.
Criss-Cross Energy Director Design For Ultrasonic Welding
CRISS- CROSS ENERGY DIRECTOR DESIGN |
The use of the criss-cross energy director design has proven to be beneficial for many ultrasonic plastic welding applications. This weld joint has been used in the medical, electronic and automotive industries and has been a good joint design for achieving strong bonds with hermetic seals. Essentially, the criss-cross energy director design utilizes the standard energy director shape where a triangular shaped bead of material is molded into the plastic wall. This molded-in triangular ridge of plastic is very effective at reducing the cycle time to achieve a weld and in compensating for non-uniform wall surfaces. Depending upon the wall thickness and the application, the energy director typically varies in height in a range from .010 to .035 of an inch. The peak of the energy director should be sharp with a triangular shape formed from a 60º or 90º included angle. The energy director design has been used for years as a means of focusing the energy to improve weld strength and reduce cycle time. The energy director has typically been placed only on one half of the part and runs along the surface to be welded. Without this energy director the weld quality would be suspect for many applications. The criss-cross design adds additional energy directors to the mating part, which increases the amount of material interaction. On the mating surface opposite the perimeter energy director, a series of perpendicular energy directors are molded-in to mate with the perimeter energy director. When a hermetic seal is desired these additional energy directors should take on a saw tooth pattern with each energy director repeating from the base of the proceeding energy director. Because there are energy directors on both mating surfaces, the energy director height on each half should be reduced to prevent excessive material flash during welding. Typically, it is recommended that the criss-cross energy director height be approximately 60% of the standard design.
The joint is particularly effective when used in combination with a tongue and groove joint design. The tongue and groove design provides the alignment necessary for a good ultrasonic weld joint and the groove serves as an excellent reservoir for the melted material. This pooling of plastic material helps contain the material and reduces the likelihood of a leak path.
Because of the increased material flow with the criss-cross energy director design, it is recommended that a tongue and groove joint be used to capture the additional plastic and contain the flash.
This criss-cross design certainly increases the mold cost, but we’ve seen applications where the weld strength has far exceeded expectations and hermetic bonds have been achieved that might not have been achieved using the standard energy director on one mating surface. As always, each application is unique and should be evaluated thoroughly before implementing a joint design.
Setup of Ultrasonic Plastic Welding Applications – Part 1
Obtaining the optimum setup conditions for a given application using ultrasonic weld equipment usually requires a series of tests to determine the welding parameters that provide the best results. Although there is no solution for circumventing this testing procedure, a proper understanding of the principles and components of an ultrasonic assembly system will help to expedite the process of reaching the optimum setup conditions for a given application. To begin our understanding of the optimizing process, it is necessary to understand the basic components that make up an ultrasonic welding system. The system usually consists of six basic components.
3) The BOOSTER is a machined piece of aluminum or titanium metal, which is tuned to resonate at the desired frequency and designed to increase or decrease the motion that is produced at the face of the converter. The following decreases/increases can be obtained depending upon the booster used. The booster is sometimes color coded to ease identification of the booster amplification. The booster is attached to the face of the converter via a mechanical stud.
Converter Amplitude (.001) * Booster Gain = Output at Booster
Purple Booster .001 * 0.6: 1 = .0006 output at Booster
Green Booster .001 * 1:1 = .001 output at Booster
Gold Booster .001 * 1.5:1 = .0015 output at Booster
Silver Booster .001 * 2.0:1 = .002 output at Booster
Black Booster .001 * 2.5:1 = .0025 output at Booster
The booster is an important element in determining the output amplitude of the converter/booster/horn assembly. The correct booster and horn combination is very important because amplitude is a critical variable in achieving a successful results with a given application.
4) The ultrasonic HORN is a machined tool that resonates at the desired frequency. The horn is usually manufactured of titanium, aluminum or steel. The primary purpose of the horn is to uniformly transfer the ultrasonic energy to the work piece. The horn is usually made to match the shape of the part to most efficiently transfer this energy. Depending upon the size of the horn, there are various shapes of horn designs to increase the amplitude of the converter/booster/horn assembly. The horn is attached to the booster through the use of a mechanical stud. You can find more information about ultrasonic horns at www.patsonics.com.
5) The ACTUATOR is the pneumatic delivery system of the ultrasonic power. Its components consist of:
- Solenoid valve
- Cylinder
- Flow control valve
- Pressure regulator
- Air gauge
- Carriage to hold the converter/booster/horn assembly
- Slide mechanism to deliver the carriage with the horn to the part
- Triggering mechanism to determine the amount of pressure delivered to the part before the ultrasonic energy is activated or turned on.
- Communication ports to interface to the power supply
Ultrasonic welding systems can be as simple as on/off or more intelligent units providing greater control and monitoring. Both deliver ultrasonic power to the work, but the intelligent systems provide the ability to weld to distance, monitor distances during welding, digitally monitor the pressure gauge, electronically set the trigger force, monitor the trigger switch distance range and control and monitor the forces seen by the system during welding. Pressure is a key variable in the delivery of ultrasonic power to the work. The dynamics and control of this variable are not well understood by many manufacturers that use the ultrasonic welding process.
6) The POWER SUPPLY PROGRAMMER is the control component that determines the sequencing, the duration, the delivery and monitoring of ultrasonic power applied to the work. On less sophisticated ultrasonic units, the duration of ultrasonic vibration is controlled primarily by time. Specifically, once ultrasonics is turned on or activated by a trigger switch, ultrasonic power continues to stay on until the duration of time is complete as established by the preset programmed time. With this type of programmer, there is limited control and monitoring of other system variables.With the advent of technology, the capability to expand the modes of welding and the monitoring of the welding process has grown dramatically. The more sophisticated units allow the ultrasonic welding machines to weld by distance, weld by energy, weld by peak power, weld by compensation modes and to monitor time, energy, force, power, down speed, amplitude, trigger distances, etc. It is the power supply programmer coupled with other system devices that provides all the modern day control and information about the process.